Skip to content

Closing checklist

Before shutting down the desk, check each item:

  • Every event shows green (official) in the event list.
  • Check results with the whole meet as scope shows no errors you have not decided to accept.
  • The status shows Sync: up to date.
  • Results published on the website, if required (Settings › Public Site).
  • Final reports printed or exported as PDF.
  • Results sent to CBDA, if the meet came from Piscina.
  • Files exported for whoever needs them.
  • Upload & release done.